Ctrl K
ComunidadGuías…

LAUNCH_CHECKLIST.md

Rama main · réplica de lectura del repositorio original.

Archivo original ↗Preguntar a KiBot
# Jiro v0.3.1 Launch Checklist

## Pre-Launch Tasks

### Phase 4: Pro Tier
- [x] API key authentication system
- [x] 4-tier plan system (Free, Starter, Pro, Enterprise)
- [x] Rate limiting per API key
- [x] Quota management (daily limits)
- [x] Usage tracking and analytics
- [x] Pro router with all endpoints

### Phase 5: Production Ready
- [x] README.md with full documentation
- [x] Dockerfile for containerization
- [x] docker-compose.yml for local development
- [x] Kubernetes Helm chart
- [x] OpenAPI 3.1 specification
- [x] SDK generation scripts (Python, TypeScript, Go)
- [x] Pro tier tests (820+ offline tests passing)

### Documentation
- [x] API endpoint documentation
- [x] MCP tool documentation
- [x] Pricing page content
- [x] Integration guides

### Testing
- [x] Unit tests for Phase 1 (25 tests)
- [x] Unit tests for Phase 2 (30 tests)
- [x] Unit tests for Pro tier (16 tests)
- [x] All 820+ offline tests passing

---

## Launch Day Tasks

### 1. Final Verification
```bash
# Run all tests
pytest tests/ -v

# Verify Docker build
docker build -t jiro:0.3.1 .
docker run -p 8000:8000 jiro:0.3.1

# Verify Helm chart
helm install jiro ./helm/jiro
```

### 2. Deploy Production
```bash
# Push to container registry
docker tag jiro:0.3.1 registry.jiro.dev/jiro:0.3.1
docker push registry.jiro.dev/jiro:0.3.1

# Deploy to Kubernetes
helm upgrade --install jiro ./helm/jiro -f helm/jiro/values-prod.yaml
```

### 3. Post-Deploy Verification
```bash
# Health check
curl https://api.jiro.dev/v1/monitor/health

# Test search
curl -X POST https://api.jiro.dev/v1/search \
  -H "Content-Type: application/json" \
  -d '{"q": "test query"}'
```

### 4. Monitoring Setup
- [ ] Configure uptime monitoring (UptimeRobot, etc.)
- [ ] Set up error tracking (Sentry)
- [ ] Configure log aggregation (Loki, ELK)
- [ ] Set up metrics dashboard (Grafana)

### 5. Communication
- [ ] Announce on Twitter/X
- [ ] Post on Hacker News (Show HN)
- [ ] Post on Reddit (r/programming, r/selfhosted)
- [ ] Update Product Hunt listing
- [ ] Send email to waitlist

---

## Post-Launch Tasks

### Week 1
- [ ] Monitor error rates
- [ ] Respond to user feedback
- [ ] Fix critical bugs
- [ ] Optimize performance based on usage

### Week 2
- [ ] Add popular feature requests
- [ ] Improve documentation based on questions
- [ ] Set up customer support workflow

### Month 1
- [ ] Analyze usage patterns
- [ ] Optimize pricing if needed
- [ ] Plan v0.2.1 features based on feedback

---

## Success Metrics

### Technical
- [ ] API uptime > 99.9%
- [ ] P95 latency < 500ms
- [ ] Error rate < 0.1%
- [ ] All 820+ offline tests passing

### Business
- [ ] 100+ API keys created (Week 1)
- [ ] 10+ Pro tier subscribers (Month 1)
- [ ] 5+ Enterprise inquiries (Month 1)

---

## Emergency Contacts

- **Technical Lead**: [Name]
- **DevOps**: [Name]
- **Support**: support@jiro.dev

## Rollback Plan

If critical issues arise:
1. Revert to v0.1.2: `helm rollback jiro 0`
2. Or: `docker-compose up -d jiro:v0.1.2`
3. Investigate and fix
4. Re-deploy when stable